WE ARE DONE!!! So we must shout it to the world!... or at least put it on this blog so we can look back and remember all the blood, sweat and tears that went into this place. This project took a total of 2 months from start to finish. We did most of the work ourselves which saved us tons of money and made us have a newfound respect for people that do this kind of work every day for a living.
Walls were textured, primed (2 times in most places), and painted. A tile entry was put in, a door removed, stress cracks and holes in the wall puttied, caulking replaced, and we even had internet and electrical outlets put in above the fireplace so our tv can nest there. UGLY hardwood floors and laminate were removed. When we've told people we tore out our hardwood floors, we get these looks of shock and sayings of "How could you?!" Trust us. It's been a MAJOR improvement. We don't understand why people LOVE hardwood floors. I, personally, love to sprawl out on the floor while I'm playing with Gavin and change his diaper there. I love how it absorbs the sound and makes our home so much quieter. I also love how it feels soooooo much warmer. Plus, I prefer vacuuming to sweeping and mopping, and an occasional spill on it doesn't bother me at all.
So... here she is!
front door/piano room
leads into living room
living room
which leads into dining room/kitchen
utility room/garage door off of kitchen
hallway
hallway bathroom
bedroom #1
bedroom #2
master bed
more of master
(This picture best shows the color of our paint. Some of the other pictures make it look almost like a mustard color, but it's not.)
master bath